Follow us :

MS Carbon Steel PlateQ345b/Q275JR/ST52

MS Carbon Steel PlateQ345b/Q275JR/ST52
MS Carbon Steel PlateQ345b/Q275JR/ST52MS Carbon Steel PlateQ345b/Q275JR/ST52MS Carbon Steel PlateQ345b/Q275JR/ST52MS Carbon Steel PlateQ345b/Q275JR/ST52MS Carbon Steel PlateQ345b/Q275JR/ST52
FOB Price

US $540.001 - 50 ton

US $535.0051 - 100 ton

group name
Hot rolled steel
Min Order
25 ton
brand name
RENTAI STEEL
model
Steel Plate
Nearest port for product export
Tianjin, Shanghai, Qingdao, Rizhao
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, CIP
Acceptable payment methods
T/T, L/C, Westem Union
update time
Fri, 24 May 2019 14:56:49 GMT

Paramtents

  • Standard AISI, ASTM, BS, GB, JIS

  • Grade Q235B,SS400,S235JR,A36

  • Application House, Industrial plant, Airplane, Laboratory, Inf

  • Shape Flat sheet

  • Place of Origin Tangshan, China (Mainland)

Packging & Delivery

  • 300cm x 120cm x 3cm
  • Min Order25 ton

Briefing

MS Carbon Steel PlateQ345b/Q275JR/ST52
Thickness: 1.5-16mm
Width: 1000/1220/1250/1500/1800/2000mm
Length: 2000-12000mm

Detailed

2.jpg

1.jpg

 

 

Product Name

Rentai supply hot rolled mild astm grade carbon weight of steel plate 2mm thickness

Standard 

 AISI,ASTM,BS,DIN,GB,JIS

Grade 

Q195-Q420, SS400-SS540, S235JR-S355JR, ST Series ,A36-A992, Gr50

Material   

Q195,Q215,Q235-A,Q235-B,Q235-C,Q235-D,Q255-A,Q235-B,Q275

Thickness

1.5mm-120mm

Width

600mm-1500mm

Length

3000mm--12000mm

MOQ

25tons.We also can accept sample order.

Brand Name

Rentai

Technique

Hot rolled 

Special use

High-strength Steel Plate

Appiication

Steel construction structures, bridges, ships, vehicles, boilers

Delivery Time

Within 7-25workdays after receiving deposit or L/C

Delivery terms

FOB/CFR/CIF/EXW WORKS

Payment term

T/T or L/C or .......... Trade Assurance

 

.jpg

.jpg

 

Packaging

Standard seaworthy export packing, other types of packing can be customized as every requirement.

Shipping packaging

Bundled with firm steel straps, easy for loading and unloading.  

Shipping time

5-7  work days after delivery

Shipping way

BY SEA,BY TRAIN

Shipping port

TIANJIN PORT,JINGTANG PORT, CAOFEIDIAN PORT

 

2.jpg

.jpg 

.jpg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

2.jpg